Skip to product information
1 of 4

Wilderdog

Pacific Blue Reflective Long Lead - 30ft

Pacific Blue Reflective Long Lead - 30ft

Regular price $48.00 USD
Regular price Sale price $48.00 USD
Sale Sold out
Shipping calculated at checkout.

Still working on your recall? Grab a 30 foot rope leash to give your dog room to roam, while still keeping him safe. Our long lead is also great to use as a tie-out while camping. (*But don't leave dogs unattended on a tie-out!) 

  • Length: 30 ft
  • Made with tightly spun, polypropylene/polyester ⁵⁄₁₆ in rope
  • Woven with reflective strands for use in low or no light conditions
  • Aluminum carabiner swivels and locks
    • Carabiner width: 1.5 in
    • Carabiner length: 2.5 in
    • Rated for 3 kN
  • Suitable for all dogs

Care

  • Wash by hand with warm water and mild soap. Thoroughly swish it around, then drain the dirty water. Repeat until the water runs clean.
  • Hang or lay flat to dry, uncoiled, away from direct sunlight
  • Towel dry any hardware immediately after washing
View full details