{"product_id":"pacific-blue-reflective-long-lead-30ft","title":"Pacific Blue Reflective Long Lead - 30ft","description":"\u003cp\u003eStill working on your recall? Grab a 30 foot rope leash to give your dog room to roam, while still keeping him safe. Our long lead is also great to use as a tie-out while camping. (*But don't leave dogs unattended on a tie-out!) \u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eLength: 30 ft\u003c\/li\u003e\n\u003cli\u003eMade with tightly spun, polypropylene\/polyester\u003cspan\u003e \u003c\/span\u003e\u003cspan\u003e⁵⁄₁₆ in\u003c\/span\u003e\u003cspan\u003e \u003c\/span\u003erope\u003c\/li\u003e\n\u003cli\u003eWoven with reflective strands for use in low or no light conditions\u003c\/li\u003e\n\u003cli\u003e\n\u003cspan\u003eAluminum carabiner swivels and locks\u003c\/span\u003e\n\u003cul\u003e\n\u003cli\u003e\u003cspan\u003eCarabiner width: 1.5 in\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003eCarabiner length: 2.5 in\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003eRated for 3 kN\u003c\/span\u003e\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003eSuitable for all dogs\u003c\/span\u003e\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cstrong\u003eCare\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli aria-level=\"1\"\u003e\u003cspan\u003eWash by hand with warm water and mild soap. Thoroughly swish it around, then drain the dirty water. Repeat until the water runs clean.\u003c\/span\u003e\u003c\/li\u003e\n\u003cli aria-level=\"1\"\u003e\u003cspan\u003eHang or lay flat to dry, uncoiled, away from direct sunlight\u003c\/span\u003e\u003c\/li\u003e\n\u003cli aria-level=\"1\"\u003e\u003cspan\u003eTowel dry any hardware immediately after washing\u003c\/span\u003e\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"Wilderdog","offers":[{"title":"Default Title","offer_id":49569825751279,"sku":null,"price":48.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0611\/3322\/6223\/files\/LONG-LINE-30-r1_1800x1800_9ca06755-2d7a-48b8-99e1-9615576782dc.jpg?v=1779302580","url":"https:\/\/www.tailswagnh.com\/products\/pacific-blue-reflective-long-lead-30ft","provider":"Tailswag","version":"1.0","type":"link"}